Turnkey homes, explained by topic
Each topic brings together one in-depth guide and two concise supporting articles.
Engineering, comfort and guarantees

From design to keys: how a LITHENZA home is delivered in 90 days
A step-by-step look at design, factory production, site preparation, assembly and handover — and why the sequence is predictable.
- Delivery
- 90 days
- Envelope assembly
- about 14 days
- Control
- documented stages
NZEB comfort: insulation, airtightness and fresh air as one system
Energy performance is not one thick layer of insulation. It comes from a continuous envelope, controlled air exchange and correctly sized engineering.

What fixed price and written warranties should protect
The contract should turn promises about budget, timing and quality into specific obligations that can be checked at handover.

Product, projects and purchase

The home calculator is live — see your price in three minutes
Nine questions turn an early idea into a clear home brief, an indicative price range and a useful starting point for a conversation with LITHENZA.
- Time
- about 3 minutes
- Questions
- 9
- Result
- home brief + estimate
LITHENZA projects: material, light and architecture
The projects gallery is a catalogue of architectural directions that can be adapted to the family, the plot and the selected LITHENZA format.

MICB Smart Purchase: 30% now, 70% after handover
A payment model designed to reduce the buyer’s exposure while the home is being produced and assembled.
